GPS, inc.
Print PagePrint Page

 
Founded in 2001, GPS Design inc. provides aircraft engineering and certification services, including design, drafting, generation of Engineering Orders, OEM level wiring diagrams, installation drawings, fabrication drawings, test reports, substantiation reports, Instructions for Continued Airworthiness (ICAW) Reports including EWIS (Electrical Wiring Interconnect System) ICAWs and FAA DER Services (Electrical Systems and Equipment).

GPS offers clients a full range of quality documentation and support services, including on-site installation support services and On-Site DER Test Witnessing.

On Staff Design Engineering Representative (DER) hold current GACA (General Authority Civil Aviation) Saudi Arabia DER Delegation (Electrical Systems and Equipment) and also provide EASA approvals via partnership with an EASA Part 21 DOA.

GPS Design, inc. provides the following services below:

Generate Design Data Package (DDP) including:

  • Engineering Order
  • Avionics Systems Drawings (Wiring Diagrams)
  • Electrical Installation Drawings
  • Electrical Fabrication Drawings (if required)
  • Structural Installation Drawings
  • Structural Fabrication Drawings
  • Placard Fabrication Drawings
  • Master Kit List
  • Wire Routing and Clipping Drawings

Generate Certification Package (CP) including:

  • Certification Plan
  • Weight and Balance Report
  • Ground Functional Test Plan
  • Flight Functional Test Plan
  • Ground EMI/RFI Test Plan
  • Flight EMI/RFI Test Plan
  • Airplane Flight Manual Supplement
  • Instructions for Continued Airworthiness Report
  • Maintenance Manual Supplement
  • IPC Supplement
  • Wiring Diagram Supplement
  • EAPAS/EWIS ICAW
  • Master Data List

STC Administration:

  • Submit STC Application
  • Review, Approve and Submit Design Data Package (DDP)
  • Review, Approve and Submit Certification Package (CP)
  • Coordinate all DER/DAR activity
  • Coordinate all FAA Meetings
  • Coordinate all data submittals to the FAA
  • Work directly with FAA as required
  • Submit Part Conformity Request
  • Submit Installation Conformity Request
  • Generate and submit TIA and Risk Assessment (if required)
  • Submit ground and flight test results to the FAA 

DER Meetings:

  • Coordinate and Attend any and all DER and/or FAA meetings for successful program completion

Part Conformity:

  • Perform Parts Conformity Inspection (DAR) at place of manufacture
  • Issue Statements of Conformity (DAR)

Installation Conformity:

  • Perform Installation Conformity Inspection (DAR) on-site at installation facility
  • Issue Statements of Conformity (DAR)
  • Issue Experimental Airworthiness Certificate (Airworthiness DAR) (if flight test is required)
  • Issue Standard Airworthiness Certificate (Airworthiness DAR) (if flight test is required)

On-Site Ground and Flight Testing:

  • Witness Ground Operational and EMI/RFI Tests (Systems & Equipment DER)
  • Witness Flight Operational and EMI/RFI Tests (Flight Test DER) (if required)